Pgh paving projects -interactive map

← Back to Forums


edronline
Member
#

Don’t think this has been posted before. Not many East End projects scheduled so far for 2016-7.
Interactive map


buffalo buffalo
Participant
#

Still on last year’s projects (some of which were delayed or multi-year), I think. Doesn’t look like it’s been updated for this year yet.


chrishent
Member
#

Yup. A bunch of these were done last year.


edronline
Member
#

And they have very few projects listed for 2016 when they will certainly do more. I wonder if they will update it when the asphalt plant opens for the season?


buffalo buffalo
Participant
#

Right–I think the projects you see listed for 2016 aren’t 2016-projects per se, they’re projects the City planned to do but didn’t get to last year, or something (that site doesn’t work on my phone hardly at all, so I’m not really able to check right now).

I don’t know when they’ll announce this year’s projects. If you look back through when past years’ lists have come out, I think it’s tended to be in April, and kind of a surprise.

It probably is a function of the asphalt plant, particularly them telling the City how much they intend to charge this year and the City figuring out how much paving they can therefore afford to do in the year…


mjacobPGH
Member
#

Some of the “Planned Projects” are because of coordination with the utility companies. For instance, DPW was going to pave a segment of Pioneer last year but PWSA(I think) had a 100-yr-old pipe under it that was due to be replaced so it made more sense to wait rather than pave and have it torn up again. Prior to this admin, there was very little coordination with the utility companies to avoid these types of scenarios. Additionally, utility companies would often only pave half the street in the past but, if the rest of it could stand to be paved, there is more coordination to have them do the whole thing and reimburse them later. Asphalt prices certainly have some to do with the budget for paving and they are effected by oil prices. However, the work is also bid out to be completed by a contractor.


edronline
Member
#

I assume that asphalt will be cheaper this year, then.


buffalo buffalo
Participant
#

City releases 2016 paving plan (49+ miles!), plus “has contracted with Cartegraph, Inc. to conduct a comprehensive pavement condition assessment of all 2,400 lane miles of city-owned streets. As part of the assessment process, Cartegraph staff will travel every mile of street using specially equipped vehicles that collect detailed information on twelve different distress criteria, including previous patching, potholes, and alligator cracking.”
http://pittsburghpa.gov/mayor/release?id=5868

To-be-paved highlights include multiple parts of Millvale Ave between Liberty and Baum, a healthy chunk of the awful cement section of Centre Ave, the entirety of North Neville, much of South Bouquet and Dawson in Oakland, Fifth from Robinson to Birmingham Bridge, most of Sixth Avenue and three blocks of Liberty Downtown…and that’s just the ones I use frequently. The list literally stretches from California and Bascom Avenues at the Bellevue line to New Homestead in the far southeast and from Fairywood to East Hills. See the whole map here: https://pap.accela.com/envista-public-web/index.xhtml?token=Pittsburgh


chrishent
Member
#

Worth highlighting East St as well, as that one will probably include moar bike lanes! Also, lower Federal St, Sandusky/7th in the North Side, that super shitty section of Smallman past 34th St., parts of Negley, frickin’ Riverview Park (please do the downhill side. Please!), Wenzell Ave, etc.

I doubt other people get as pumped for paving projects as those of us that frequent this forum


DoubleStraps
Member
#

Ooooooo, of interest to about three people, Neidel St./S. Main St. in the West End, the super steep hill that Stu tagged as a potential “alternate Dirty Dozen” hill, which he also described as a “moon-like surface”, as I recall.

This is really nice because Neidel St. to the Elbon St. steps is my go-to Steuben St./Rt. 60 bypass to get to points west of the city.


buffalo buffalo
Participant
#

I believe much of North Negley and (at least the uphill side of) One Wild Place are to get bike lanes, too.

(Worth noting as well that Better Streets Lawrenceville has long had reconfiguration of outer Butler St to make it safer to get to the Zoo area from that direction on our project wishlist…)


Benzo
Participant
#

S. Millvale, Center, and N. Neville St. Thank goodness. I ride all these everyday and they all are potholed messes constantly. Though I see my commute being aweful while this is going down. Time to start riding the MTB to work.

Also pumped about paving in riverview (the streets here are so bad) and east street (because bike lanes)

Also like that the worst part of higland ave (inside the circle) is getting paved, again a consistently bad area with lots of traffic.


chrishent
Member
#

I know this list is subject to change, but I was kinda wishing that they would repave Stanwix this year, but that will probably have to wait until the “GAP to Point” cycle track designs are finalized. Also, eastbound Mellon Terrace in Highland Park needs serious love.


StuInMcCandless
Participant
#

You had me at lower Federal Street.

Both directions, that bit of street is particularly difficult, partly because of road surface, partly because of cars breathing down your neck, partly because of all the pedestrian cross traffic.

I have to say, the repaving of Perrysville from the city line all the way down, over two seasons about three or four seasons ago, has held up very well. I sure hope this season’s work holds up at least as well.


Benzo
Participant
#

I am concerned with the paving of urbana way between davidson and st johns way. It’s a belgian block street, and unless they are planning to rip out all the blocks, this may create more problems than it solves after a season or two of freeze / thaw.

This is likely why most of the rest of urbana way is a potholed mess, except this belgian block section section, because they paved over belgian block. Though, it could be partially because they just havn’t re-paved urbana in quite a long time as well. I’m not an expert in paving.


Jason-PGH
Member
#

Looks like the potholed mess that is Neville is getting repaved, as well as Centre. The worst part of Neville is from Centre to Bayard.


Benzo
Participant
#

Almost the entire bloomfield to oakland bike route is being repaved between liberty and bayard. S. Millvale, Center, Neville. All 3 have been in bad shape for years, it will be a rough ride this summer, but once it’s done, it will be fantastic.


Jason-PGH
Member
#

Just something to note after the Penn Avenue debacle last year. If you are headed downhill on Millvale, you can see exposed trolley tracks. This may, if the city notices it, delay the paving process. If they do end up removing the tracks, it will make the road as a whole much less susceptible to potholes in the future.


edronline
Member
#

East end getting love and attention. Yay.


buffalo buffalo
Participant
#

those who have commented here so far are all east-enders, but as i noted above, the map itself looks pretty well distributed to me…

https://pap.accela.com/envista-public-web/index.xhtml?token=Pittsburgh


buffalo buffalo
Participant
#

Related (these are both State projects):

– Liberty Bridge rehab to begin in four weeks…. http://www.penndot.gov/RegionalOffices/district-11/Pages/details.aspx?newsid=458

– Baum Blvd Bridge to close Monday for almost three months: https://twitter.com/PGHDistrict8/status/715635764739092484
(‘detour information’ link is to a PDF…)

The latter especially is likely to cause problems again for riders in Bloomfield (Liberty is the official detour) and North Oakland (Centre and Craig will probably see a lot of added traffic as well). Hopefully Polish Hill won’t be hit as hard this year.


edronline
Member
#

One wild place!!!! Halfway done. Bike lanes coming?


edronline
Member
#

And negley from Stanton to Highland Park. (For the marathon)


chrishent
Member
#

Negley paving seems about done. Wonder when the bike lane is going in. Haven’t seen any news about it


StuInMcCandless
Participant
#

The hilly part of Milroy (on North Side, between East and Perrysville) is done, and it isn’t even on the map! (The street is, but the paving isn’t on either the map or the accompanying list.)


Jason-PGH
Member
#

Devonshire – Fifth Avenue to Centre is milled as of 4/17


Benzo
Participant
#

FYI. The short term upcoming work schedule can be found at
http://pittsburghpa.gov/dpw/StreetPavingSchedule

Usually lists stuff that will probably happen in the next two weeks or so. Actual work varies depending on temperature and weather forecast.


stefb
Participant
#

ELB looked like it was milled going toward negley at negley when I went by this morning. Hoping that bike lanes are repainted quickly after paving, but I have a feeling that they won’t be, and it will be a two lane highway for vehicles like it was before.


Jason-PGH
Member
#

Devonshire is paved in it’s entirety.


Benzo
Participant
#

I’ve seen a lot of fresh crosswalk paint lately. They may be working their way to it.

I’m sure they are a bit behind on the paving schedule due to the cold snap a week or so ago.

The alley behind my house was milled in late march, but I’m still waiting for it to even get the coarse base of pavement put down.


buffalo buffalo
Participant
#

Yeah, I was surprised to see Devonshire getting paved yesterday, as two other streets on my route to work, 46th and Millvale, were milled and pre-paved weeks ago but still haven’t been finished yet.

I wouldn’t mind as much if they’d bevel the damn edges at the ends of the work zone, but the jump back onto the pavement on NB Millvale is a bit difficult to manage with traffic on your ass and gravel all over everywhere….


chrishent
Member
#

Sandusky St on the North Shore has been paved and is silky smooth :-)


edronline
Member
#

There is a massive divot on Negley, but I forget where. Somewhere in East Liberty. Maybe right outside of (old) Babyland. Quite scary to ride your bike over if you are going full speed. It is about 2 feet long and extends the entire length of the road.

There is also another one on One Wild Place right near where it meets Butler Street. I think that one only is in the right trafic lane. I was driving this time, and it almost removed the underside of my car. I assume these are all getting fixed sometime soon as they are in the paving areas, but both are fairly dangerous.


Jason-PGH
Member
#

East Liberty Boulevard is paved. But no line markings, so it has returned to the 2 lane superhighway. Let’s count the number of days until the lines are painted.


stefb
Participant
#

I was hoping that they would pave all of ELB and put the bike lane where it belongs: right next to the curb. But why would they actually do anything for cyclists that makes sense? I sure love riding past Obama school in the bike lane and trying to stay out of the door zone when there is an event, yet staying 4 feet away from moving traffic.


Jason-PGH
Member
#

Two major cuts in Liberty Avenue with little notice.

First one is at 38th Street. There is a base layer of paving down but the bump is enough to startle you.

The second one is worse, and it is at 39th Street. This is milled all the way down with large cinders in the pit.

Hit these at 30 mph last night and was, to say the least, surprised.


stefb
Participant
#

Still no paving done on the jail trail. Just a few days left in April. Weather has been nice.

← Back to Forums

You must be logged in to reply to this topic.